Skip to Main navigationSkip to Content  
 
Transpower Logo
Banner Image

Studies / Agreements

Studies

Title   Date   Description

file type icon WGIP Investigation 1 (Part A)| [369kB]

May 2007 Effect of unpredictability of wind generation on pre-dispatch processes.

file type icon WGIP Investigation 1 (Part B) [1.4MB]

May 2008 Effect of unpredictability of wind generation output on scheduling.

file type icon WGIP Investigation 2 [396kB]

May 2007 Effect of wind generation on dispatch.

file type icon WGIP Investigation 3 [657kB]

May 2007 Effect of wind generation variability on asset loading.

file type icon WGIP Investigation 4 [1.4MB]

May 2007 Effect of wind generation on ability to manage system voltages within voltage quality targets.

file type icon WGIP Investigation 5 [616kB]

May 2007 Effect of wind generation on management of frequency excursions.

file type icon WGIP Investigation 6 [1.2MB]

May 2007 Effect of wind generation on small disturbance voltage stability.

file type icon WGIP Investigation 7 [4.2MB]

May 2008  Effect of wind generation on transient stability.

file type icon WGIP Investigation 8 [3.4MB]

May 2008 Effect of wind generation on small signal stability.

file type icon WGIP Investigation 9 [1.3MB]

May 2008 Effect of wind generation on reactive power contribution and dynamic voltage responses.

file type icon SFT Constraint Publication Specification [110kB]

Jul 2006 Summarises the proposal for publishing security constraint information from late 2007 when the System Operator introduces a new application to automatically generate n-1 thermal security constraints.

file type icon Tactical Wind Generation Project [554kB]

Dec 2005 Rationale for proposed rule changes to accommodate the connection of further wind generation until the Wind Generation Investigation Project is complete.

file type icon Manawatu Wind Generation [856kB]

Sep 2005 Observed Impacts on the Scheduling and Dispatch Processes.

Agreements

Title        Date    Description

file type icon LQA - Signed Agreement [341kB]

26 Feb 2004 The Electricity Commission’s Common Quality Advisory Group proposed the EGR’s be change to require publication of “Local Quality Agreements” (LQA’s). This was intended to provide greater transparency of where there are agreements for voltages to be managed to higher limits that the default AOPO limits in Part C.

However both Transpower and the System Operator have agreed to publish the transitional LQA agreement the parties entered into immediately prior to the EGR’s becoming effective. This is intended to negate the need for a rule change. Publication of this agreement and the schedule will considerably improve transparency for asset owners on the voltage profiles the system operator manages within over agreed parts of the grid.

file type icon LQA - Special Condition Offer [142kB]

26 Feb 2004