| Title | Date | Description |
Determination of Causer [65kB]
|
May 2011 |
Determination of Causer: Under Frequency Event 9 April 2011 |
Unplanned Failover to SAD [74kB]
|
Mar 2011 |
Letter explaining the unplanned failover to Stand Alone Dispatch (SAD),on 19 March 2010. |
Report on the use of discretion [108kB]
|
Feb 2011 |
This report provides an overview of the issues presented to the System Operator over the period 23-27 January 2011 and the actions taken to maintain system security.
|
Market Systems Loss of Service [215kB]
|
Dec 2010 |
An unplanned market system outage occurred on Saturday 4th December. This outage affected participants, the report endeavours to outline the sequence and nature of the events that occurred. |
Terms of Reference [179kB]
|
Dec 2010 |
The Terms of Reference for the review of the decision to split the KIN-TRK circuits during September/October thereby placing the Kinleith GXP on reduced security. |
Multiple Frequency Keepers Project Report [788kB]
|
Oct 2010 |
Multiple Frequency Keepers Project - Report 2: Alternative Market Designs |
Report on the use of discretion [112kB]
|
Sep 2010 |
This report covers the reason why discretion was used to bring on generation, reconfigure the grid and re-rate the Hamilton Tee-Whakamaru (HAT-WKM) circuit on the 6th September 2010.
|
AUFLS Summary Card [1.6MB]
|
16 Aug 2010 |
Summary Card This summary card provides you with an overview of what AUFLS is, how it works in New Zealand, how we compare internationally, and an introduction into the AUFLS technical report |
AUFLS Technical Report [2.9MB]
|
16 Aug 2010 |
Technical Report on Auto Under Frequency Load Shedding in New Zealand |
|
AUFLS Appendices
Appendix A [1.2MB]
Appendix B [939kB]
Appendix C [12.0MB]
Appendix D [227kB]
Appendix E [247kB]
Appendix F [16.7MB]
|
|
Appendices for the Technical Report on Auto Under Frequency Load Shedding in New Zealand
App A: Collation of International Policies for Under Frequency Load Shedding App B: International Under Frequency Events resulting in System Splits App C: North Island Data App D: South Island Data App E: Islanding Results App F: South Island Results
|
Whirinaki Dispatch [173kB]
|
Jul 2010 |
Query on why Whirinaki (WHI) station was dispatched on 15 June 2010.(additional report) |
Whirinaki Dispatch [116kB]
|
Jul 2010 |
Query on why Whirinaki (WHI) station was dispatched on 9 June 2010. |
Whirinaki Dispatch [206kB]
|
Jun 2010 |
Query on why Whirinaki (WHI) station was dispatched on 15 June 2010. |
Multiple Frequency Keepers Project Report [353kB]
|
Apr 2010 |
Details a strawman approach for implementing AGC with details of the proposed interface to generators and the HVDC. |
Whirinaki Dispatch [180kB]
|
Mar 2010 |
Query on why Whirinaki (WHI) station was dispatched on 18 February 2010. |
Real Time Pricing Issues [68kB]
|
Nov 2009 |
On 12 November 2009, Real-Time Prices (5 minutes prices) were incorrectly published to the market. This report explains how this occurred, the steps taken to resolve the issue and the action undertaken to minimise the likelihood of recurrence. |
Whirinaki Dispatch [50kB]
|
Oct 2009 |
Query on why Whirinaki (WHI) station was dispatched on 10 September 2009. |
South Island Frequency Event [278kB]
|
Sep 2009 |
A summary report on the South Island frequency event that occured on 1 August 09. |
Huntly Unit 5 Commissioning [122kB]
|
Nov 2007 |
Learnings from the Huntly Unit 5 commissioning (2007). |
North Island Frequency Excursion [45kB]
|
May 2007 |
A summary report on the North Island frequency excursion that occurred on 29 April 07. |
Benmore Tripping Event 30 Mar 07 [86kB]
|
Apr 2007 |
Initial investigation report for the 30 March 2007 tripping at Benmore Power Station and the HVDC Pole 1 that resulted in the loss of 326 MW from the South Island power system. |
Otahuhu and Huntly Tripping Event [214kB]
|
Dec 2006 |
Summary of events on 1st December 2006 when restoring the power system after the tripping of the Otahuhu CCGT coincided with a further loss of generation at Huntly, resulting in a Grid Emergency |
Huntly Unit 5 Commissioning Information Overview Document [103kB]
|
Nov 2006 |
This paper provides an overview of the changes required to the System Operator’s scheduling and dispatch process to enable the commissioning of the new unit 5 generating unit at Huntly |
Wellington Voltage Stability Study During HVDC South Transfer [226kB]
|
Sep 2006 |
Report to determine the system limits for power flow from Bunnythorpe to Haywards while HVDC is in south transfer for the Wellington |
Summary of South Transfer Limits post May 2006 [186kB]
|
Sep 2006 |
This presentation is to explain the transmission limits for future dry year events and comment on SI reserves interaction with HVDC dispatch |
Review of 19th June Generation Shortfall [92kB]
|
July 2006 |
Report to determine what factors contributed to the shortfall and the changes in availability of generation on the 19th June and the previous day |
Initial Report on 19th June Generation Shortfall [902kB]
|
June 2006 |
Report for the Minister of Energy into the Operation of the New Zealand Electricity Power System on Monday 19th June 2006 |
System Operator Constraint Audit [191kB]
|
April 2006 |
Review of the Process for Design, Development, Testing, Application, Real-Time Use, and Removal of Security Constraints |
System Operator Constraint Audit Recommendations & Actions [66kB]
|
April 2006 |
Recommendations and Actions from the Review of the Process for Design, Development, Testing, Application, Real-Time Use, and Removal of Security Constraints |
Otahuhu 220 kV Fault [41kB]
|
Feb 2006 |
Report of system event at Otahuhu Substation on 15th February 2006 at 09:34 hrs |
NI Frequency Excursion Report [39kB]
|
Jan 2006 |
Report on frequency excursion on 11 Dec 2005 |
SI Frequency Excursion Report [24kB]
|
Dec 2005 |
Report on frequency excursion on 04 Dec 2005 |
HVDC Pole 1 Unplanned Outage [36kB]
|
Mar 2004 |
|