Guides / Procedures

Guides

TitleDateDescription

file type icon Asset Capability Information Overview [719kB]

Jul 2009 This document gives an overview of what is required in an ACS and the timing of submission of data to the System Operator.

file type icon Black Start Scope [21kB]

Sep 2006 High level scope of black start service test.

file type icon Companion Guide for Asset Testing [2.6MB]

30 Aug 2007 Provides guidance on test objectives and the required test results for routine and commissioning tests for assets including those which are the subject of an ancillary services procurement contract. The guide outlines the types of tests that could be carried out to achieve the test objective and relevant standards and codes to assist asset owners.

file type icon Connecting and Dispatching New Generation in NZ guide [331kB]

Jun 2007 The purpose of this Guide is to explain the related processes of:
- ‘dispatching’ generating sets to the New Zealand Power system and
- ‘connecting’ generating sets to Transpower’s transmission network
- This dual purpose reflects the nature of Transpower’s identity - as both Grid Asset Owner and New Zealand’s System Operator.

file type icon SSF Guidelines [611kB]

Dec 2009 These guidelines cover the purpose, content, principles, forecast horizon, assumptions and assessment in system security forecasts.

file type icon Standard Site Abbreviations [607kB]

Jun 2010 TP AG.10.11 Appendix B Transpower standard site abbreviations.

file type icon UG-DP-001 Purch Exceeding Max Inst Demand Change Limits Guide [320kB]

8 May 2009 Guide for demand customers to use to notify the System Operator where the maximum instantaneous demand change limit and net rates of change in offtake for electricity exceeds 40 MW per minute within each island or is more than a 75 MW change in any 5 minute period.

Procedures

Title     Date   Description

file type icon PR-EA-010 Planned Asset Testing [736kB]

Nov 2007 Used to provide a process for managing Asset Owners requests to carry out asset testing while connected to the power system.

file type icon Commissioning / Decommissioning Policy and Process [238kB]

Feb 2007 The purpose of this abridged document for third party asset owners is to provide an outline of the process to follow through commissioning and decommissioning.

file type icon Distributor Manual Demand Disconnection Process [66kB]

   

file type icon Process for Assessment of Parallel Grid Exit Point [58kB]

07 Nov 2005
(Draft)
This document describes a high level process to enable the Distributor, Grid Owner and System Operator to assess and agree to, or decline requests to parallel Grid Exit Points (GXP) in advance of the need to carry out the parallel switching.

file type icon PR-SD-004 Conflict of Interest Procedure [486kB]

May 07 This procedure is to assist System Operator staff and employed consultants to comply with the obligations detailed in the EGRs, namely to identify, evaluate and manage any conflicts of interest.

file type icon PR-OC-204 Security Constraints Process Overview.pdf [371kB]

24 May 2010 This document gives background information about the security constraint development process.  It explains the SPD model and constraint types, and gives an overview of considerations around applying constraints.

file type icon PR-OC-208 Identify Need for Constraints [320kB]

23 Mar 2009 This document provides procedures for performing Power System Security Assessment

file type icon PR-OC-213 Conduct Peer Review of Security Constraints [269kB]

24 Mar 2009 This procedure outlines the steps to follow when carrying out a peer review of a newly-created or updated constraint

file type icon PR-OC-229 Email Notification CANs Updating Website [167kB]

13 Jul 2010 This procedure explains the process for:
- sending an email notification of constraint changes
- drafting a Customer Advice Notice (CAN)
- sending an update to the System Operator website.