| ID | Title | Date | Description |
| FM-EA-006 |
Dispensation / Equivalence Application Form [76kB]
|
Nov 2007 |
Application form for applying for Dispensation / Equivalence arrangements. |
| |
Grid Owner ACS Version 2.0 [320kB]
|
Apr 2004 |
ACS spreadsheet for Grid Owners. |
| |
Distributor ACS Version 5.0 [172kB]
|
Mar 2004 |
ACS spreadsheet for Distributors. |
| |
Distributor Demand Shedding Data Sheet [28kB]
|
Mar 2004 |
Used to notify the System Operator GXP demand shedding capability. |
| |
Notice of Intention to Connect [16kB]
|
|
Information required by the System Operator where a generator with the net output greater than 1 MW intends to connect to the grid or a local network. |
| FM-EA-008 |
Generator Notice of Initial Offer [72kB]
|
Jan 2010 |
This form must be completed for each generating plant that is intended to be offered on the market. |
| FM-EA-009 |
Purchaser Notice of Initial Bid [86kB]
|
Jan 2010 |
This form must be completed for each GXP that a purchaser intends to submit bids for. |
| FM-EA-010 |
Test Plan [374kB]
|
Feb 2010 |
Form to be used to notify the System Operator of Asset Testing of plant while connected to the power system. |
| FM-EA-011 |
Urgent Change Notice [86kB]
|
Sep 2007 |
Form to be used to notify the System Operator when a temporary change to asset capability occurs. |
| FM-DP-001 |
[78kB]
|
Apr 2009 |
Form to be used by participants to notify the system operator of GXP’s that the instantaneous demand change limit as defined in the policy statement clause 29.1 has the capability to be exceeded. |