| ID | Title | Date | Description |
| |
Grid Owner ACS Version 2.0 [320kB]
|
Apr 2004 |
ACS spreadsheet for Grid Owners. |
| |
Distributor ACS Version 5.0 [172kB]
|
Mar 2004 |
ACS spreadsheet for Distributors. |
| |
Distributor Demand Shedding Datasheet [39kB]
|
Oct 2010 |
Used to notify the System Operator GXP demand shedding capability. |
| FM-EA-006 |
Generator Notice of Intention to Connect [64kB]
|
Oct 2010 |
Information required by the System Operator where a generator with the net output greater than 1 MW intends to connect to the grid or a local network. |
| FM-EA-008 |
Generator Notice of Initial Offer [72kB]
|
Oct 2010 |
This form must be completed for each generating plant that is intended to be offered on the market. |
| FM-EA-009 |
Purchaser Notice of Initial Bid [86kB]
|
Oct 2010 |
This form must be completed for each GXP that a purchaser intends to submit bids for. |
| FM-EA-010 |
Planned Asset Testing Form (MS Word) [265kB]
Planned Asset Test Form (PDF Form, rt click and use saveas option) [153kB]
|
Aug 2011 |
Form to be used to notify the System Operator of Asset Testing of plant while connected to the power system. |
| FM-EA-011 |
Urgent Asset Capability Change Notice [102kB]
|
Mar 2012 |
Form to be used to notify the System Operator of an Urgent Asset Capability Change of plant. |
| FM-DP-001 |
Notification of Demand Capable of Exceeding Maximum Instantaneous Demand Change Limits [77kB]
|
Oct 2010 |
Form to be used by participants to notify the system operator of GXP’s that the instantaneous demand change limit as defined in the policy statement clause 29.1 has the capability to be exceeded. |